Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2335

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
在线亚洲日本欧美日韩国产| 色综合1| 97人人模人人爽人人少妇| 国产成人免费视频精品| 欧美中文一区| 国产午夜视频自拍| 亚洲人精品午夜在线观看| 国产三级国产1一D| 在线中文字幕一区| 亚洲一线精品精品在线观看| 亚洲永久在线| 蜜桃麻豆WWW久久囤产精品| 成人国产精品一区二区网站公司| 国产AV麻豆杨颖| 亚洲欧美激情精品一区| 91蝌蚪91九色| 亚洲传媒无码| 日韩欧美亚洲一区SWAG| 8av在线播放| 国产高清精品一级毛片| 亚洲无码在线观看免费| 国产艹久久av| 国产综合视频在线观看| 国内精自线i品一区202| 欧美亚洲色图视频| 国产成人免费ā片在线观看| 天天中文字幕精品免费视频| 亚洲欧美人妻自拍| 国产三级剧情中文字幕在线观看| 亚洲狠狠爱Av综合影院| 久久婷婷五月综合的| 免费大片黄国产在线观看| 日韩在线视频网站的| 黄色AV网站不卡| 亚洲欧美视频色图| A级强奸毛片| 亚洲成AV人影院在线观看网| 国产精品国产馆在线真实露脸| 真人性人交视频免费观看| 久久久夜夜骑| 亚洲伊人成综合|