欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > Installation details that must be paid attention to in steel structure processing
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2414

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
强暴人妻中文字幕| 亚洲大啪啪窝| 国产棚户区嫖妓精品| 日韩,欧美文,中文| 日本熟妇色视频一区二区三区| 在线日韩视频一区二区人妻| 欧美二区香蕉视频| 欧美亚洲综合性| 无码九九一本| 天堂成人小说| 国产精品亚洲四区| 95国产精品午夜福利视色| 国产精品无码不卡一区二区三区| 亚洲成人AV电影观看| 超碰人人超在线观看| 人人操人躁| 精品99精品免费| 亚洲无码中文字幕高清爽片| 国产综合久久久久久一本| av.色呦呦| 国产三级AV绿色在线一区| 江永县| 狠狠躁夜夜躁无码东京热| 中日美女孕妇,毛片| 天天外国产视频| 黄色视频日本色色视频| 亚洲伊人久久综合一区二区| 人妻中文字幕无码专区在线| 日韩精品久久中文字幕| 五月天婷婷激情网| 午夜久久久久| 性色AV极品无码专区亚洲AV | 免费AV一区二区三区| av不卡在线播放| www.爱爱AV| 人妻少妇精品中文字幕AV| 无码国产v片在线观看| 寻乌县| 久久久久99精品成人片欧美片| 亚洲AV日韩AⅤ永久无码| 97人妻人人澡人人爽人人精品|