欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2738

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产日韩精品视频无码| 国产精品三级片在线。| 亚洲国产群交无码| 国产精品青草久久福利不卡| 亚洲欧美国产国产一区| 国产av大全| 激8欧美国产| 色日本日韩.com| 久久人妻无码一区二区| 99国产欧美久久久精品蜜芽 | 97在线超碰资源观看| 国产精品久久久久久久伊一| 色悠悠,综合视频| 不卡成人网| 中久成人网| 在线看片z无码人成免费| 操逼一区二区三区欧美大片| 97无码人妻免费视频| 日韩一级欧美一级作爱| 成人精品久久| 日韩黄色电影视频| 国产精品v免费视频| 中文字幕久久网站| 一本加勒比无码精品视频| 亚洲欧美另类久久久精品能播放的| 日本高清色视频网站| 久久精品成人无码AV片观看| 色av色婷婷66人妻久久久| 中文字幕天天躁日日躁狠狠躁免费| 人人妻黄色视频在线| 人妻少妇中文字幕| ly12580.cn| 精品国产福利一区二区三区| 久久精品不卡| 国产精品极品美女自免费| 亚洲一区二区三区在线极品av| 丁香五月三级片| 色婷婷的五月| 精品亚洲精品影院国产| 国产精品嫩草影院午夜| 国产日韩欧美123|