欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3113

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
久久久久亚洲AV成人无码网站| 欧美日韩亚洲国产一区| 免费潮喷在线播放| 欧美国产伦久久久久久久| 日韩中文字幕在线观看| 人妻啊591p| 精品无码4区| 亚洲精品欧洲久久婷婷99| 亚洲色婷婷六月丁香| www.蜜桃665| 国产区 中文字幕| 人妻久久一区二区三区免费| 中文精品在线| a国产激情视频在线观看品善| 欧美黑人巨大精品一区二区| 亚洲 欧美综合| 中文字幕av一二三四区| 久久精品无码专区免费不卡| 日本中文字幕网站| 日本三级亚洲中文字幕| 亚洲精品不卡中文字幕| 囯产精品99久久精品爆乳| 久久久97精品国产一区乐长长播 | 国产精品三级片久久| 久久久亚| 国产色女人| 国产在线视频一区二区三区98 | 黑色丝袜免费人妻一区二区三区| a国产视频| 久久久久人妻一区精品色欧美 | 亚洲一区二区三区麻豆| 日韩视频在线网站| 中国A级毛片免费观看| 性色av无码专区一ⅴa亚洲| 开心丁香| av免费看在线观看免费| 国产成人无码无卡在线| 乱免费综合| 亚洲AV一码| 亚洲中文字幕在线导航| 精品国产一区二区三区波多|