欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3337

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
亚洲盗摄一区二区| 亚洲精品视频色影院| www.国产草草| 精品国产污免费网站入口| 污网站免费亚洲精品| 久久毛片日韩| 在线观看欧美一区二区三区| 91无码精品一区| 色爱av一区不卡| 亚洲伊人丝袜精品久久| 96久久久宗合视频| 2021天天日夜夜拍| 色呦呦韩日精品| 69人人人精品| 麻豆亚洲国产成人精品无码区| 中文字幕日韩无码国产激情| 亚洲色图片区| www.激情·com| 亚洲欧美日韩视频国产| 欧洲有码中文字幕在线!| 婷婷婷五月综合| 97精品久久天干天天天按摩| 911亚洲精品bbw| 亚洲国产精品狼友在线观看无码| 色综合久久天国| 中文字幕欧美日韩国产| 四虎影视紧急大通知| 麻国产麻豆—精品—a| A∨嫩草| 久久人妻无码精品| 免费看片高清不卡无码| 亚洲自拍欧美照片| 国产麻豆日韩欧美久久| 无码中文字幕a级毛片视频| 欧美日韩成人高清| 少妇无码太爽了在线播放| 日韩精品黄色av| 日本大学生三级三少妇| 男人天堂五月| 日韩美乳少妇水喷| 国产熟女一区二区三区四区五区|