Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:4108

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产96在线视频播放网站| 精精国产xxx| 99国产精品农村一级毛片| 国产精品免费啪啪啪| 涩久久久久| 久久精品国产亚洲AV无码娇色| 肉大捧一出免费视频更新时间| 亚洲国产播放| 亚洲男人伊伊视频| 国产成人精品高清在线观看99| 怡春院久久国产一区二区| 午夜福利特级黄大片日韩在线| 日韩香蕉在人线| 久久久久久综合网| 无码精品人妻一区二区三区接种 | 精品少妇一二区| 天天拍夜夜添久久精品| 韩日亚洲无码av| 国产成人免费高清视频网址| 人气日韩高清无码一区| 丁香色五月综合| 国产日韩欧美视频二区| GOGOGO免费视频观看| 国产无码乱伦自拍| 干干干AV综合| 精品人妻av无码一区二区| 天天干天天色天天| 亚洲午夜03AV在线| 中文字幕一区二区吉泽明步| 中文日韩字幕在线| 性啪啪免费看视频| 99欧美夜精品| 被黑人侵犯中文字幕一区 | 99久久精品日本一区二区免费| 无码激情不卡| 国产乱子伦60女人的皮视频| 欧美日韩一级在线观看| 欧美曹逼一区二区| 国产精品,亚洲无码| 黄片三级片av免费观看| 日韩无码中文字幕无码日韩|