欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > Foshan General Steel measuring program
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

Foshan General Steel measuring program

Time:[2016-7-6]  Hits:4204

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产女人高潮时对白| 精品人妻人妻人一区二区有限公司| 91一区不卡| 国产精品无码动漫| 天天干天天擦| 一道本欧美性爱| 玩弄放荡人妻少妇精品| 国产精品福利自产拍在线观看| 97国产欧美精品一区二区三区| 99精品激情在线视频| 四虎最新影视库视频| 日韩精品一区二区av| 亚洲一区二区三区在线电影天堂| 孕妇仑乱A级毛片免费看视频 | 亚洲欧美国产va在线播放| 99久久久免费国产精品| 老色鬼av永久在线| 天堂网在线最新版www资源网| 優質欧美成人爽爽爽视频| 99日本一区二区| 无码精品尤物一区二区三区| 人妻系列av无码专区免费| 91久久精品都在这里| 日本成人色视频| 亚洲精一区二区三区| 亚洲乱字幕| 欧美一级黄色精品| 欧美日韩色网站| 国精品无码一区二区三区久久 | 欧洲最强潮水公交车| 久久久国产日日精品| 毛片不收费免费看| 东京热66| 波多野结衣手机在线aⅴ| 欧美日韩国产免费区二区三区| 成人女人a毛片免费看| 国产中文91| 午夜欧美日韩在线视频播放| 日韩久久久精品视频| 国产真实一区二区三区| 亚洲人成无码网ww|