Foshan main steel members (b)

Time:[2016-5-14]  Hits:5255

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
五月天国产高清无码| 品久久久久久中文字幕| 亚洲欧美洲综合18P| 超鹏香蕉| 龙陵县| 亚洲精品自产拍在线观看无码 | YY1111111少妇无码影院| 神马一区国产| 久久精品无码一区二区国产| 天天爱综合| 稀缺呦稀缺呦AV| good一区二区在线| 亚洲国产精品无码一区二区| 伊人丁香社区| 美女帅高潮视频网站| 欧美亚洲日本校园春色| 国产精品18久久久久久首页| 在线播放亚洲美女视频网站| 一本久久知道综合久久| 伊人网av| 五月天视频在线欧美| 久久成人 色| 国产精品久久东京热| 干高跟丝袜无码中出| 美日韩成人黄色视频| 男人搞女人的网站| 2021国产综合在线| 欧美老妇人视频在线| 在线成人| 99久久精品国语对白| 日本人妻不卡视频| 国产成人高清精品亚洲一区二区| 亚洲欧洲色色| 欧美美丽少妇xxxx| 综合激情一区| 精品无码久久中文字幕乱| 办公室熟妇人妻久久精品色欲 | 五月亭亭六月丁香| 日本黑人乱偷人妻中文字幕| 老司免费黄色网站| 色婷婷99综合久久久精品|