raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4881

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产在线视频换妻| 久久久妇女| 一本一道a√无码中文字幕| 日韩免费三级片| 久久婷婷成人网| 风流老熟女一二三区中文字幕| 黄色毛片一级无码| 中出无码一区| 大战丰满人妻性色AV偷偷| 11毛片| 国产 精品 野外| 婷婷激情久久天天爱| 在线国产网| 亚洲男人的天堂色偷| 欧美日韩中文一区| 亚洲国产午夜电影在线入口 | 蜜臀久久99精品久久久久久小说| 色五月社区综合| 国产欧美在线精品一区| 久久精品国产区二区三区日韩| 欧洲l五月丁香综合网免费| 中文字幕小说在线网络| 欧洲亚洲视频在线免费观看| 国产网站网址| 意大利AV在线| 精品国产哟哟在线观看| 亚洲中文字幕久久精品无码喷说 | 色就是色 亚洲色图| 国产不卡你懂的| 亚洲色欧另类欧美| 亚偷精品| 成人小说精品一区| 三级亚洲美洲字幕| 成人影片一区免费观看| 久久这里有精品视频| 孕交美女| 人妻公开视频免费97| 黑人巨大无码在线免费观看| 日韩AV线上| 欧美日韩亚洲黄色电影| 亚洲无码专区一区二区|