欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > Guangzhou Steel says:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

Guangzhou Steel says:

Time:[2015-7-4]  Hits:4529

Guangzhou Steel says: "The construction quality inspection norms steel works' quality requirements and inspection provisions

(1) Guangzhou Steel Steel: The steel is one of the following conditions should be carried out sampling re-examination, re-examination of its results should be in line with national commodity specifications and design requirements: imported steel; steel mixed batch; thickness equal to or greater than 40mm, and slab design performance requirements.
Inspection reports of high strength large hexagon head bolts convergence deputy and vice torsional shear strength bolts factory should join with me respectively with the tightening torque coefficient and axial force (pre-tension) to: (2) convergence with the fastening member specification.
(3) Guangzhou Steel Engineering steel welding: carbon steel should be cooled to ambient temperature in the cold, low-alloy structural steel welding should end after 24h, conduct inspection of welds.
(4) Guangzhou Steel Fasteners convergence projects: Normal bolt when the bolt as a permanent link, when the design requirements or II statement of their mass, should be a minimum tensile load of the bolt physical reinspection. A convergence of high strength bolts, bolts should be separately produced and device unit for anti-slip friction coefficient test and retest the surface. 2 high-strength hexagon head bolts screwed convergence deputy final end 1h after the final screwing torque check should be carried out within 48h. 3 deputy final convergence of high strength bolts screwed threaded bolts exposed should be 2 to 3 buttons, which allow 10% of threaded bolts to reveal a button or 4 button.
(5) steel member assembly works: Cranes and crane truss girder should Deflection.
(6) The single steel apparatus engineering: all vertical single steel main structure of promised deviation should be consistent H / 1000, and not greater than 25.0; all the twists and turns of the promised plane deviation should be consistent L / 1500, and not greater than 25.0. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
亚洲乱码中文论理电影| 91亚洲精品久久久蜜桃借种| 欧美日韩一区二区乱码| 国产污污免费网站| 欧洲亚洲中文字幕| 天天一插av| 日韩有码一区| 免费观看草草| 性色国产欧美亚洲另类| 卓尼县| 自拍性旺盛老熟女| 国产精品无码一区二区毛片视频| 嫩草蜜桃亚洲精品| 色婷婷无码在线观看| 内91精品在线| 国产99中文字幕| 精品一区二区精| 香蕉久久夜色精品升级完成| 久久这里| 一级毛片库存| 亚洲老女人一区二区| 精品少妇无码视频| 91理论在线| 99r这里只有精品| 亚洲国产精品久久久久婷婷影院| 久久精品国产亚洲ava| 亚洲一区二区三区四区无码| 99国产精品无码专区| 91精品国产一区| 色婷婷色丁香婷婷| 我要看日韩黄片| 狠狠躁夜夜躁人人爽天天| 国产精品爆乳无码视频一区| 99视频在线观看re热| 欧洲高潮视频在线看| 国产一区二区视频免费| 亚洲日韩精品国产三区 | 久久精品网站免费观看调教| 日韩精品无码熟人妻视频—本大道 | 九九精品99久久久香蕉| 国产精品无码毛片一级|