1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4868

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
日韩中文字幕av在线| 亚亚天天射| 久久另类TS人妖一区二区| 亚洲免费看片| AAAAAA无码| 精品久久久久久18免费看| 中文字幕一区二区三区永久| 大陆亚洲精品国产| 午夜久久国产精品一区二区| 欧美日韩黄片免费| 99国产这里只有精品视频播放| 龙州县| 丁香五月 激情综合| 亚洲一区二区三区高精| 四虎精品| 国产免费无码一区二区| 精品九九精品久久网| 欧美专区日韩| 中文字幕亚洲乱码在线| 极品黑丝久久| 欧美大屁股喷水| 日韩一级aa| 亚洲国产精品专区久久| 777久久久免费精品国产| 成人国产狼窝在线视频| 男人天堂成人在线| 久久亚洲精品成人AV| 久久久一到道本| 免费91麻豆精品国产自产在| 欧洲精品与欧美精品| 91婷婷射| 久久无码日韩毛片| 成人精品 免费| 精品亚洲福利网站| 全部免费的毛片在线看蜜芽| 久久久久嫩逼丝袜| 9A蜜桃久久久久久免费| 国产成人毛片不卡网址| 天天射天天干天天射干| 91国内揄拍国内精品对白| 亚洲中文字幕精品无码中文|