欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > Engineering Technology: General requirements for inspection of steel structure engineering foundation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4607

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
久久99免费视频| 亚州AV色倩片在线观看| AV无碼電影| 国产ā片免费观看| 好大好湿硬顶到了的好爽视频| 巨胸喷水www久久久| av无码专区亚洲avl| 色偷偷91久久综合噜噜噜噜| 精品综合在线免费视频| 欧美人妻中文网| 92久久久久国产精品| 人大芸窗| 国产精品毛片一区二区在线看 | 无码一区二区波多野结衣| 99国产99久久久久久| 精品视频国产狼友视频| 九九视频在线播放免费| 中文字幕亚洲制服| 精品无码中出一区二区三区| 无码,一区 二区| 欧美精品第20页| 一区二区久久国产精品| 亚洲国内视频一下| 亚洲人成绝费网站色WWW| 日韩午夜福利视频| 亚洲精品久久久久久下一站| 国产丝袜一区二区三区在线观看| 婷定香花五月天中文字幕在线| 区区区区区区区区亚洲| 亚洲夜夜爽不卡| 97久久久免费观看| 亚洲精品aaa揭晓| 成人自拍亚洲| 先锋影音在资源播放| 国产精品自拍网址| 毛片一区二区| 成人人人在线| 四虎永久在线精品免费观看地址| 亚洲AV成人无码久久精品同性| 国产日本亚洲一区二区三区 | 少妇zw喷水在线|