欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5226

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
中文成人无码精品久久久| 亚洲国产无码专区| 天堂AV最新日韩| 蜜桃一区二区三区在线观看视| 亚洲av色图| 久久久久久久久免费视频| 超碰aⅴ人人做人人爽欧美| 亚洲天堂无码一二三区| 青青草原视频这里只有精品久久| 一区二区三区无码中文| 91中文字幕一区二区无码| 在线观看视频免费日韩| 中文字幕在线观看无码| 人人开苞久久| 欧美一区精品| 天天日狠狠操| 久久久亚洲精品无码| 伊人久久999大香线蕉无码| 丁香五月亚| 亚洲人乱交视屏| 首页一区无码在线| 综合国产美女精品| 欧美日本一道本播放| 亚洲色图自拍中文字幕| 色哟哟在线观看视频| 又爽又骚的考逼视频| 亚洲污| 99久久精品囯产91久久久 | 午夜福利国产精品2020| 床上动作片丝袜| 亚洲人成自拍网站| 邻居一级毛片免费视频| va老司机免费看| 国产精品久久久久久久久无码一级 | 人妻在线一区二区三区精品| 高清无马日韩| 国产Ⅴ亚洲V天堂a无码麻豆| 久久a热6| 国产伦精品一区二区三区二区| 亚洲春色无码视频| 中国亚洲香蕉视频|