Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2502

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
麻豆亚洲国产成人精品无码区| 97爱视频| 国产在线自在拍91| 人妻制服丝袜无码中文字幕| 国模一区私拍视频| 国产高清在线丝袜精品一区| 香蕉久久夜色精品国产2020| 久凹凸| 亚洲AⅤ永久无码一区二区三区| 亚洲欧美日韩二区字幕制服丝袜v| 鲁鲁爱插插| 亚洲丨无码| 无码精品国产一区二区三区免费| 国产一区二区无码中文| 精品三级黄色com| 一区二区三区污网站| 国产精品久久……| 久热免费视频| 亚洲国产成人精品无码区在线| 一级a性色生活久久无码| 久久思思无码无码| 亚洲一区二区少妇| 无码18毛片| 91精品人妻一区二区六十路| 日韩欧美日韩视频网站| 久久久五月丁香| 风情艳主调教视频国产| 亚洲w欧洲无码sss222| 国精产品一二二区视频| 九色最新福利网站| 久久国产精品店| 亚洲高清一二三四| 国产麻豆天美精品人人爱色欲| 亚洲一区二区少妇| 日韩无码激情视频| 老司机av网站一区| 一本一道久久a久久精品综合蜜臀| 99精品久久久久久| 国产精品国产精品国产专区不粉h 亚洲欧洲成人AV每日更新 | 日韩丝袜亚洲国产中文欧美一区| 国内精品国产三级KTV|