欧美精品在线视频,一级毛片无码无卡无遮挡,密臀av免费线观看,激情淫荡少妇人妻视频

Language:CHINESESENGLISH

Home > News > Main reinforcement construction methods of steel workshop building reinforcement
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.szcxdj.com.cn

Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2476

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
黄色电影视频国产精品| 久久久久人妻一区精品色| 亚洲国产精品VA在线| 手机在线国产精品| 伊人六月成人综合影视| 六月天伊人玖玖| 人妻精品第| 五月激情婷婷久久| 黄色在线网站| 国产午夜鲁丝片AV无码第一 | 亚洲字幕在线中午mw| 四虎影院无码在线观看| 国产一级精品免看不卡p| 嫖 国产 一区| 操欧美久久| 日韩精品无码成人专区免费一区| 久久老人操| 大香蕉A91| 东京热不卡| 婷婷五月六月日韩欧美| 正在播放爆乳奶水| 久久精品国产72国产精| 亚洲国产中文成人av手机在线观看| 久久久夜色精品亚洲| 综合欧美日韩一区二区三区| 久在线一区观看| 思思在线国产精品伊人| 久久久免费视频一卡区| 日韩精品无码中文字幕区| 手交刺激在线观看国产| 国产免费黄视频啪啪| 久久精品中文| 最新av在线播放| 00XX视频| 看医生视频久久播放| 999国内少妇毛片视频| 五月丁香综合激| 99re热这里只有精品视频首页| 久久艹伊人网| 成人综合在线观看视频| 黑人超长久久久|